
Discover · Processor1
Introducing Processor1.
A 24-metre, 200-gross-ton steel landing barge built to carry the whole deployment model into places roads don’t reach, and others can’t.

One platform. Everything aboard.
- Lands on the beach. A bow ramp puts equipment and people ashore without a wharf.
- Carries everything at once. Room for containerised processing, water, health, dive, communications and disaster-response gear, plus crew accommodation.
- Lifts the heavy stuff. Winches, gantries and deck space for recovering nets and moving machinery.
- Sovereign solutions. Trained local operators, spare parts and a clear handover, so what we leave behind keeps working.
One platform, four problems.
Processor1 is how every part of the model reaches the places that need it.
Ghost netsA working platform at sea, with winches and gantries to lift nets and deck space to bring them home.
Safe waterCarries water systems, spares and training to the villages that need them.
FuelFour separate tanks keep fuel from different plastics apart. The plan is to blend them in a day tank to suit Processor1’s operations, targeting safe diesel standards. Its main engines and generators already run on our plastic fuel.
LogisticsLands equipment straight onto the beach, no wharf needed.
Where Processor1 is at.
DoneOwned and afloatOur first deployment platform since Nov 2021.
DoneRun on plasticMain engines and generators have run on our own plastic fuel, neat and blended with diesel.
Being readiedRefit fully costedSurvey, flag registration, repairs and safety works are priced and waiting on funding. Crew identified and on standby.